Our local contacts are experts who are ready to help
Large, unpredictable oil spills can defeat even the most conservatively designed pollution control systems. The OSV is an economical option used to confine hydrocarbon spills to the premises for safe disposal. Contech’s OSV is fabricated from either non-corrosive Stainless Steel or PVC and has only one moving part, the ballasted float. When an oil spill occurs, the float loses buoyancy as the free-floating oil depth increases until it finally seats on the discharge port, closing and confining the spill.
The Oil Stop Valve housing is fabricated from non-corrosive PVC (low risk of fire) or stainless steel (high risk of fire) to provide greater design flexibility and pricing options. It is typically installed below ground and in-line with the piping system and can also be installed in pre-assembled concrete manhole or vault designs.
Feature | Benefit |
---|---|
Dependable, gravity operation | Can be used as part of a Spill Prevention Control and Countermeasure (SPCC) plan |
Large flow capacity | Eliminates the need for additional structures |
Only one moving part, and no power requirement | Low operation and maintenance costs |
Self-operating options (slave valve) | Ease of operation |
Corrosion resistant construction | Increased longevity and service life |
Outlet sizes: 4”, 6”, 10” & 12” | Design flexibility |
Technical information for this product is located in the technical guide’s section.
Our team is ready to provide you with expert advice and assistance on local regulatory requirements, resulting in faster approvals.
Our engineers can review your requirements, weigh all options, and recommend the optimal solution to integrate with your site designs.
Our engineers can assist by providing product specific engineering calculations such as hydraulics, buoyancy, foundation reactions, and unit sizing.
We can quickly provide engineer’s cost
estimates to assist with your solution
selection process.
Our engineers can provide site-specific drawings for proposals, project meetings, and submittals, helping you be more efficient with your time.
Contractors know time is money, so we provide preconstruction meetings, delivery coordination, and on-site installation support to ensure a timely, smooth installation.